Import a PM checklist into your CMMS

Every CMMS Ready checklist is a CSV with the same ten columns: asset type, PM title, frequency, trade, estimated hours, downtime, procedure steps, parts, safety and pass/fail criteria. Each guide below maps those columns to one vendor's import file, with the formulas and the gotchas, and was checked against the vendor's public help pages on the date shown on the page.

MaintainX

Column map to the work order importer, hours to seconds, staggered due dates, and where the recurrence is set.

Limble CMMS

Map to the PM template import file, Repeat X Weeks/Months schedule columns, hours to minutes, steps into Instruction columns with Limble's syntax.

Run a different CMMS? Tell us which one at [email protected] and it goes on the list. No CMMS yet? The CSVs print fine as paper checklists.

The free CSVs

Every set uses the same ten columns, so one mapping covers all of them. Direct download, no signup:

Loading a whole site, not one asset?

The Maintenance Planner Toolkit has all 11 asset classes (39 PM tasks) in one CSV with these same columns, plus an asset register template, a parts min/max calculator, a weekly KPI dashboard, a compliance calendar and a 90-day setup guide. Built by a working maintenance planner, not a software vendor.

See the full toolkit, $99